Integration of Project Development and Delivery

The potential integration of design, construction, maintenance, and operation provides incentives for the private sector to optimize expenditure and maximize innovation to achieve the greatest level of cost efficiency over the life of the asset through a life-cycle approach to asset delivery rather than minimizing the cost of a specific part of the asset lifecycle e.g. construction costs.