Pocahontas Parkway (Richmond, Virginia)107

• 8.8 mile road closing the southeast portion of the loop around Richmond.

• Original Plan: 20,000 vehicles per day

• Reality: 10,000 vehicles per day; bonds dropped to junk status

• Concession taken back from the Pocahontas Parkway Association and sold to Australia's Transurban Group for $611 million in 2006. Transurban agreed to:

- Pay all of Pocahontas Parkway's existing debt (Transurban paid $191 million in equity) - Reimburse VDOT's costs incurred to operate, maintain and repair the Pocahontas Parkway, including upgrading the existing electronic tolling equipment

- Finance and build the Route 895 Airport Connector Road

• VDot officials are pleased with Transurban's management of the asset to date