Developing the Public Sector Comparator

The PSC incorporates an assessment of all project costs, revenues and risks projected for the project. The PSC developed should be used as a VFM assessment tool throughout the procurement process and as a management tool for considering options during bidder negotiations and consultation. The PSC should therefore be developed using realistic costings for a realistic alternative to the PPP model being considered.