Suggestions for re-engineering or improving the DBB model are included the following, however they have not been fully explained in this report, but were uncovered during the interviews and information derived from other recent research studies. Appendix B has more details.
• Lump sum contracts
• Partnering type concepts
• Financial rewards and penalties
• QC by Contractors
• Not Low-Bid selection criteria (includes other type measures aligned with project objectives)
• Ability to accept Alternative Technical Concepts (ATC) at tender stage
• Include LCC if possible (some do after tender award)
• Utilizing advanced project management information systems & ICT tools