Recommendations - DB Model

Some improvements to the DB model that have not been fully explained in this report, but were uncovered during the interviews and information derived from recent research studies include:

•  Maximum design prior to tender < 30% (Huge hurdle)

•  Using Quality-based selection criteria (guideline - spread of greater than 40% is recommended)

•  Develop performance-based specifications as a deliberate process

•  Use real teaming & partnering concepts

•  Consider reward sharing practices within the DB contractor's team

•  Allow and accept Alternative Technical Concepts (ATC) at tender stage

•  Co-location of Design-Build team with client

•  Utilizing advanced project management information systems & ICT tools

•  Risks allocation matrix at tendering stage