4.  TRANSFER OF ASSETS ON CONTRACTOR DEFAULT

On termination under Clause 67 (Termination for Contractor Default), the Authority shall have the option to require the Contractor to transfer to the Authority all of its right title and interest in and to the Assets [(or such part of the Assets as may be required by the Authority)] in accordance with Clause 80 (Consequences of Termination or Expiry).