79.3 Results of Survey
If the final survey shows that the Contractor has not complied with or is not complying with its obligations under Clause 26.1 (Maintenance) the Authority shall:
79.3.1 notify the Contractor of the rectification and/or maintenance work which is required to bring the condition of the relevant Assets to the standard it would have been in if the Contractor had complied or was complying with its obligations under Clause 26.1 (Maintenance) (the "Required Standard");
79.3.2 specify a reasonable period within which the Contractor must carry out such rectification and/or maintenance work; and
79.3.3 recover the cost of the survey from the Contractor by means of a withdrawal from the Retention Fund Account or deduction from the next payment of the Unitary Charge.