Procurement Case Study - an example of risk allocation in the Field Electrical Power Supplies project

8  The overall level of requirement for field electrical power was determined in a power study conducted by SEA in 1998. The Department determined that under a conventional procurement, 1531 generators would be required. This formed the basis of the public sector comparator.