Methodology

Document review

The study team examined literature assessing different areas of Metronet's performance. Documents reviewed included:

  Freshfields Bruckhaus Deringer and Ernst & Young, Report for the Office of the PPP Arbiter, Contract Management Study - Phase One, October 2005

  Deloitte Report commissioned by Metronet for Extraordinary Review, 2007

  Halcrow Report for the PPP Arbiter, Guidance for Extraordinary Review, 2007

  PPP Arbiter, Annual Metronet Report 2006, November 2006

  PPP Arbiter, Reference for Directions from Metronet Rail BCV LtdInterim level of ISC pending a direction on ISC at Extraordinary Review, Draft Directions, July 2007

  PPP Arbiter, Reference for Directions from Metronet Rail BCV Ltd, Directions on Form and Structure of Extraordinary Review and Net Adverse Effects and Infrastructure Service Charge at Extraordinary Review, Initial thoughts, September 2007

  London Underground Limited, Managing Director's Performance Reports 2003-04 to 2007-08

  Transport for London, London Underground and the PPP reports, 2003-04 to 2007-08

  Metronet BCV and SSL Annual Asset Management Plans (AAMPs) 2003-04 to 2007-08

  Hornagold and Hills, BCV Stations Cost Phasing Report, PPP Contract Works Performance Review, prepared for London Underground Limited, June 2007

  Hornagold and Hills, PPP Contract Works Performance Review, Station Case studies, Epping, Loughton, Plaistow, April 2007

  EC Harris, Metronet Station Base LiningValidation Report, December 2006, produced as independent review for Metronet Rail

  PricewaterhouseCoopers, London Underground Limited, Project Perm, Summary of Findings and Emerging Conclusions, July 2006

  PricewaterhouseCoopersRegression Analysis for Station costing, October 2007, for London Underground based on Turner & Townsend Cost Projections

  Department for Transport and London Underground official and other high level meetings, 2004-2008

  Metronet BCV and SSL board minutes, 2003-2008

  Working Group, Metronet Long-Term Structure Options, prepared for Joint Steering Committee, 2008