PFI Project
| Capital value of change £000 | Associated operating cost in first year £000 | Description of change | How was the cost validated? |
Not suitable for competitive tendering | ||||
A419/A417 Swindon to Gloucester DBFO | 200 | 15 | Take on the change to project facilities and maintenance arising from the construction of the Calcutt Rear Access Improvement Scheme. | This is a change in the existing maintenance specification so tendering would not have been appropriate. The cost was checked against typical industry rates. |
A50/A564 Stoke-Derby Link DBFO | 133 | 7 | Adoption of current best working practice for the operation of Mobile Lane Closures. | This is a change in the existing maintenance specification so tendering would not have been appropriate. |
Buckinghamshire Hospitals - Stoke Mandeville | 12,183 | 640 | Upgrade to NHS cleaning and infection control standards | The cost was compared with the existing schedule of rates. This is an extension to the existing service subject to periodic benchmarking and market testing. |
Buckinghamshire Hospitals - Stoke Mandeville | 1,352 | 71 | Upgrade to the porter service. | The cost was compared with the existing schedule of rates. This is an extension to the existing service subject to periodic benchmarking and market testing. |
Buckinghamshire Hospitals - Stoke Mandeville | 761 | 40 | Additional courier service. | The cost was compared with the existing schedule of rates. This is an extension to the existing service subject to periodic benchmarking and market testing. |
Croydon Tramlink | Not yet agreed | Not yet agreed | Timetable adjustment requiring an increase in the number of trams in service. | Costs were validated by an internal exercise and the use of technical advisers. The change could only be implemented by the existing provider |
Leicester Waste Management PFI | 302 | 19 | Decision not to devolve the call centre to the contractor (as originally planned) meant that an additional member of staff was needed. | The cost was benchmarked against known staff costs. |
M40 Junction 1 to 15 | 352 | 27 | Maintenance of transmission stations and CCTV masts. | This is a change in the existing maintenance specification so tendering would not have been appropriate. Costs were verified by an internal quantity surveyor. |
M40 Junction 1 to 15 | 283 | 22 | Maintenance associated with variable message signs. | This is a change in the existing maintenance specification so tendering would not have been appropriate. Costs were verified by an internal quantity surveyor. |
M40 Junction 1 to 15 | 281 | 22 | M40 Junction 9 lane gains/ lane loss scheme. | This is a change in the existing maintenance specification so tendering would not have been appropriate. Costs were verified by an internal quantity surveyor. |
M40 Junction 1 to 15 | Not yet agreed | Not yet agreed | Maintenance associated with junction improvement and new dedicated slip road. | This is a change in the existing maintenance specification so tendering would not have been appropriate. Costs were verified by an internal quantity surveyor. |
Newham - Canning Town Housing Regeneration Project | 635 | 34 | Provision of a bulk refuse collection service. | This change resulted from a clarification of the scope of the project. The cost was benchmarked against existing costs. |
Norfolk & Norwich NHS Trust | Not yet agreed | Not yet agreed | Application of the introduction of Agenda for Change. | This change was as a result of a change in Department of Health policy and was not capable of being tendered. Costs were based on the number of staff and Department of Health regulations. |
North Cumbria Acute Hospitals NHS Trust - Carlisle | 1,895 | 114 | Increase in infection cleans (variable fee). | This is an extension to existing service subject to periodic benchmarking and market testing. |
South Gloucestershire Integrated Waste Management Scheme | 2,354 | 160 | Develop a network of plastic recycling banks. Plastic banks are rented. | The Authority explored a range of options jointly with the contractor. Costs were benchmarked and internal technical expertise used. There was only one local supplier of this specialist service (plastic banks) so it was not possible to have a competition. |
Queen Elizabeth Hospital NHS Trust | 15,216 | 864 | Application of the introduction of Agenda for Change. | This change was as a result of a change in Department of Health policy and was not capable of being tendered. Costs were based on the number of staff and Department of Health regulations. |