4.  Initial Refurbishment Works Period

4.1  During the relevant Works at the Dwelling the Tenant may raise further Tenant Waiver(s). The Contractor will encourage Tenants not to request Tenant Waiver(s) and accordingly prevent the relevant [Initial Refurbishment] Works from being carried out.  However should the Tenant raise any further Tenant Waiver(s), the Contractor will again explain to the Tenant the implications of not having the relevant elements of the [Initial Refurbishment] Works completed as planned and the Tenant will be taken through the Tenant Waiver Form as outlined above.

4.2  No Tenant Waiver(s) will be granted by the Contractor during the Initial Refurbishment Works Period should the circumstances within paragraph 3.5 above apply.