47.3  Results of Survey

If the final survey shows that the Contractor has not complied with or is not complying with its obligations under clause 23.1 (Maintenance) the Authority shall:

47.3.1  notify the Contractor of the rectification and/or maintenance work which is required to bring the condition of the Stations to the standard they would have been in if the Contractor had complied or was complying with its obligations under clause 23.1 (Maintenance) (the "Required Standard");

47.3.2  specify a reasonable period within which the Contractor must carry out such rectification and/or maintenance work; and

47.3.3  recover the cost of the survey from the Contractor by means of a withdrawal from the Retention Fund Account or deduction from the next payment of the Monthly Unitary Payment.