TABLE 1.1 - SUMMARY OF MILESTONE TARGETS

 

 

Performance Standard at the end of CIP

Milestone

 

 

 

1

2

3

4

5

6

7

8

 

Strategic Route and [Main Distributor Network] (NCImain)

18.6

 

 

 

 

 

 

 

 

NCI

Secondary Distributor Network (NCIsec)

9.9

 

 

 

 

 

 

 

 

 

Link Road Network (NCIlink)

9.9

 

 

 

 

 

 

 

 

 

[Local Access Road Network] (NCIlocal)

9.9

 

 

 

 

 

 

 

 



FCI

[Prestige], [Primary and Secondary Footway Network] (FCIprest)

6.6

 

 

 

 

 

 

 

 

 

Link and Local Access Walking and Cycling Routes Network (FCIlink)

6.6

 

 

 

 

 

 

 

 

 

[SRI] per [RSL]

>2.4

 

 

 

 

 

 

 

 

 

Structures and bridges

100% compliance with target 1.8 in Table 1.2

 

 

 

 

 

 

 

 

 

tunnels

All requirements in targets 1.9.1 to 1.9.6 in Table 1.2 are satisfied.

 

 

 

 

 

 

 

 

 

Pumping Stations

All Pumping Stations are upgraded in accordance with the requirements set out in the relevant Asset Survey Report

 

 

 

 

 

 

 

 

 

Traffic Signal Controllers

No more than [  ] years old

 

 

 

 

 

 

 

 

 

[Street Lighting]

100% compliance with targets 1.10.1 to 1.10.8 in Table 1.2