TABLE 1.2
Service Delivery Output Element | Core Sessions | Adjustment Type | Moratoria | Monitoring Frequency | ||||
1.1.1 | The Strategic and [Main Distributor Network] has an NCImain of at least 18.6. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.1.2 | No Road Section Length within Strategic and [Main Distributor Network] has an NCImain that is less than 4.4. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.2.1 | The Secondary Distributor Network has an NCI sec of at least 9.9. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.2.2 | No Road Section Length on the Secondary Distributor Network has an NCI sec that is less than 3.6. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.3.1 | Link Road Network has an NCI link of at least 9.9. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.3.2 | No Road Section Length on the Link Road Network has an NCI link that is less than 3.6. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.4.1 | The [Local Access Road Network] has an NCI local of at least 9.9. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.4.2 | No Road Section Length on the [Local Access Road Network] has an NCI local that is less than 3.6. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.5 | No Road Section Lengths has an [SRI] of less than 1.2. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.6.1 | The [Prestige], [Primary and Secondary Walking and Cycling Routes Network] has a FCI prest of at least 6.6. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.6.2 | No Walking and Cycling Route Section Length has a FCI prest that is less than or equal to 2.4. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.7.1 | Link and Local Access Walking and Cycling Routes Network a FCIlink of at least 6.6. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.7.2 | No Walking and Cycling Route Section Lengths has a FCIlink that is less than or equal to 2.4. | N/A | 1 month | Service Payment | N/A | Annual | ||
1.8 | Structures & bridges | Each Structure and Bridge (excluding [Agreed Non-Compliant Structures] and bridges) is capable of carrying the load effects in accordance with BD21 of the DMRB (unless otherwise agreed with the Authority). | N/A | 1 month | Service Payment | N/A | Structural Assessment | Annual |
1.9.1 | tunnels | All tunnel lighting points meet with the requirements of Part 7 of BS5489. | N/A | 1 hour | Service Payment | N/A | tunnel Inspection /Assessment | Annual |
1.9.2 | tunnels | All smoke detectors comply with the requirements of BD78 of the DMRB and European Directive 2004/54/EC. | N/A | 1 hour | Service Payment | N/A | tunnel Inspection /Assessment | Annual |
1.9.3 | tunnels | All ventilation complies with the requirements of BD 78 of the DMRB and European Directive 2004/54/EC. | N/A | 1 hour | Service Payment | N/A | tunnel Inspection /Assessment | Annual |
1.9.4 | tunnels | All telephones comply with the requirements of BD78 of the DMRB and European Directive 2004/54/EC. | N/A | 1 hour | Service Payment | N/A | tunnel Inspection /Assessment | Annual |
1.9.5 | tunnels | All electrical equipment complies with the requirements of BD78 of the DMRB and European Directive 2004/54/EC. | N/A | 1 hour | Service Payment | N/A | tunnel Inspection /Assessment | Annual |
1.9.6 | tunnels | All power supplies and switchgears comply with the requirements of BD78 of the DMRB and European Directive 2004/54/EC. | N/A | 1 hour | Service Payment | N/A | tunnel Inspection /Assessment | Annual |
1.9.7 | All Pumping Stations are upgraded in accordance with the requirements of the relevant Asset Survey Report. | N/A | 1 month | Service Payment | N/A | tunnel Inspection /Assessment | Annual | |
1.10.1 | [Street Lighting] | All [Street Lighting] (excluding [Agreed Non-Compliant Street Lighting]) is compliant with the requirements of BS 5489:2003 and BS EN 13201:2003 and, for the avoidance of doubt, such requirements include the information set out in Appendix A or Appendix B of this part 1 of Schedule 3 (Output Specification) (as the case may be). | N/A | 1 month | Service Payment | N/A | Annual | |
1.10.2 | [Street Lighting] | All [Street Lighting] that is [Agreed Non-Compliant Street Lighting] (excluding Non-Standard Street Lighting) is replaced at a rate of not less than [ ] Lighting Columns in each Year so that all [Agreed Non-Compliant Street Lighting] (excluding Non-Standard Street Lighting) shall be replaced on or prior to [ ] with [Street Lighting] that is compliant with the requirements of BS 5489:2003 and BS EN 13201:2003 and for the avoidance of doubt, such requirements include the information set out in Appendix A or Appendix B of this part 1 of Schedule [ ] (Service Requirement) (as the case may be). | N/A | 1 month | Service Payment | N/A | Annual | |
1.10.3 | [Street Lighting] | That all Non-Standard Street Lighting is replaced. | N/A | 1 month | Service Payment | N/A | Annual | |
1.10.4 | [Street Lighting] | The Service Provider shall in accordance with [Service Provider Programmes] of this Contract set out the details of the rate of replacement of Non-Standard Street Lighting for each Year having regard to the requirements of Table 1.2 (Service Requirement) in the Annual Investment Programme. | N/A | 1 month | Service Payment | N/A | Annual | |
1.10.5 | [Street Lighting] | The Service Provider shall not replace any Non-Standard Street Lighting in order to comply with targets set in 1.10 of Table 1.2 of Schedule [ ] (Service Requirement) unless such replacement is set out in the agreed Annual Investment Programme. | N/A | 1 month | Service Payment | N/A | Monthly | |
1.10.6 | [Street Lighting] | Where the Service Provider replaces any Non-Standard Street Lighting in accordance with this Contract the Service Provider shall ensure that any such replacements are like for like given the type of [Street Lighting] available at the date of replacement. | 1 month | 1 month | Service Payment | N/A | Monthly | |
1.10.7 | [Street Lighting] | In the event of conflict, inconsistency or ambiguity between the requirements of the above the Service Provider shall agree with the Authority which replacement item of Non-Standard Street Lighting is to be used. | 1 month | 1 month | Service Payment | N/A | Monthly | |
1.10.8 | [Street Lighting] | The Service Provider shall ensure that all Non-Standard Street Lighting are replaced in accordance with Performance Standard 1.10 shall be installed in accordance with Appendix C of this part 1 of Schedule 3 (Output Specification). | 1 month | 1 month | Service Payment | N/A | Monthly | |
1.11 | The Service Provider shall ensure that no Traffic Signal Controller is more than [ ] years old. | N/A | 1 month | Service Payment | N/A | Annual |