1. Strategic Route and [Main Distributor Network] and Secondary Distributor Network
1.1 Where the Service Provider is replacing Lighting Points on those Project Roads identified in column 2 of Table 1.3 below the Service Provider shall ensure that:
1.1.1 Lighting Points of the corresponding [Lighting Class] identified in column 3 of Table 1.3 are placed on the relevant Project Road;
1.1.2 Lighting Columns of such Lighting Points referred to in paragraph 1.1 do not exceed the corresponding maximum height of a Lighting Column identified in column 5 of Table 1.3;
1.1.3 where a Conflict Area exists on the relevant type of Project Road, Lighting Points of the corresponding [Lighting Class] identified in column 4 of Table 1.3 are placed in such relevant Conflict Area;
1.1.4 Lighting Columns of such Lighting Points referred to in paragraph 1.1.2 do not exceed the corresponding maximum height of a Lighting Column identified in column 5 of Table 1.3;
1.1.5 subject to paragraph 2.1.6, all Luminaires used on Project Roads that are classed as category 2, 3a and 3b shall have a luminous intensity class of G4 or greater; and
1.1.6 all Luminaires used on roundabouts shall have a luminous intensity class of G5 or greater.
Table 1.3 - Strategic Route & Main Distribution Network and Secondary Distributor Network
Category | Type of Project Road | Lighting | Max. Height of a Lighting Column (m) | |
2 | Strategic Routes on the Strategic Route & [Main Distributor Network] | ME2 | CE1 | 12 |
3a | Main Distributor Routes on the Strategic Route & [Main Distributor Network] | ME3a | CE2 | 12 |
3b | Secondary Distributor Routes on the Secondary Distributor Network | ME3c | CE2 | 10 |