1.  REQUIRED OUTCOMES

The Service Provider shall comply with the provisions of this Performance Standard 5 and shall:

1.1  in the event of a Civil Emergency, comply with each of the provisions of schedule [  ] (Civil Emergency Planning), which shall include, without limitation, acting in accordance with the directions of the relevant Civil Emergency Declaration and/or any relevant instructions issued by the Authority's Representative or the Development Directorate's Emergency Planning Representative in accordance with schedule [  ] (Civil Emergency Planning);

1.2  in the event of a [Highway Emergency], [Traffic Control Room Urgent Fault] or [Urgent Fault], attend at the site of such [Highway Emergency], [Traffic Control Room Urgent Fault] or [Urgent Fault] within the time periods specified in this Performance Standard 5;

1.3  in the event of a [Highway Emergency] or [Urgent Fault]  make safe the site of such [Highway Emergency] or [Urgent Fault] within the time periods specified in this Performance Standard 5; and

1.4  ensure that full repairs are made to any part of the Project Network that is damaged as a result of or in relation to any Civil Emergency, [Highway Emergency], [Traffic Control Room Urgent Fault,] [Urgent Fault] or [Urgent Aspect Lamp Failure], in accordance with the relevant provisions of this Contract.