5.2.2 SCI Calculation
5.2.2.1 SCImain in respect of a Road Section Length on the Strategic Route and [Main Distributor Network] is calculated in accordance with the following:
(a) each Road Section Length shall be divided into 20m subsections;
(b) where [DVI] is used each defect or patch identified in a subsection shall:
(i) be assigned as either a "Minor Deterioration" or a "Major Deterioration" in accordance with Table 11.13;
(ii) be assigned a "percentage defect area" as set out in the UKPMS extent code;
(iii) no subsection shall have a percentage defect area greater than 100%; and
(iv) allocate patch percentage;
(c) each subsection shall be assigned the appropriate score from Table 11.7;
(d) the score allocated in accordance with paragraph 5.2.2.1(c) will then be multiplied by the length of relevant surveyed subsection;
(e) the result of the multiplication carried out in respect of each 20m subsection in accordance with paragraph 5.2.2.1(d) shall be added together in respect of all surveyed subsections in the [RSL] and this sum shall then be divided by the total length of that [RSL] as set out in the Network Model.
5.2.2.2 SCIsec in respect of a Road Section Length as the Secondary Distributor Network is calculated in accordance with the following:
(a) each Road Section Length shall be divided into 20m subsections;
(b) where [DVI] is used each defect or patch identified in a subsection shall:
(i) be assigned as either a "Minor Deterioration" or a "Major Deterioration" in accordance with Table 11.13;
(ii) be assigned a "percentage defect area" as set out in the UKPMS extent code;
(iii) no subsection shall have a percentage defect area greater than 100%; and
(iv) allocate a patch percentage;
(c) each subsection shall be assigned the appropriate score from Table 11.8;
(d) the score allocated in accordance with paragraph 5.2.2.2(c) will then be multiplied by the length of relevant surveyed 20m subsection;
(e) the result of the multiplication carried out in respect of each 20m subsection in accordance with paragraph 5.2.2.2(d) shall be added together in respect of all surveyed subsections in the [RSL] and this sum shall then be divided by the total length of that [RSL] as set out in the Network Model.
5.2.2.3 SCIlink in respect of a Road Section Length as the Link Road Network is calculated in accordance with the following:
(a) each Road Section Length shall be divided into 20m subsections;
(b) where [DVI] is used each defect or patch identified in a subsection shall:
(i) be assigned as either a "Minor Deterioration" or a "Major Deterioration" in accordance with Table 11.13;
(ii) be assigned a "percentage defect area" as set out in the UKPMS extent code;
(iii) no subsection shall have a percentage defect area greater than 100%; and
(iv) allocate a patch percentage;
(c) each subsection shall be assigned the appropriate score from Table 11.9;
(d) the score allocated in accordance with paragraph 5.2.2.3(c) will then be multiplied by the length of relevant surveyed subsection;
(e) the result of the multiplication carried out in respect of each 20m subsection in accordance with paragraph 5.2.2.3(d) shall be added together in respect of all surveyed subsections in the [RSL] and this sum shall then be divided by the total length of that [RSL] as set out in the Network Model.
5.2.2.4 SCIlocal in respect of a Road Section Length as the [Local Access Road Network] is calculated in accordance with the following:
(a) each Road Section Length shall be divided into 20m subsections;
(b) where [DVI] is used each defect or patch identified in a subsection shall:
(i) be assigned as either a "Minor Deterioration" or a "Major Deterioration" in accordance with Table 11.13;
(ii) be assigned a "percentage defect area" as set out in the UKPMS extent code;
(iii) no subsection shall have a percentage defect area greater than 100%; and
(iv) allocate a patch percentage;
(c) each subsection shall be assigned the appropriate score from Table 11.10;
(d) the score allocated in accordance with paragraph 5.2.2.4(c) will then be multiplied by the length of relevant surveyed subsection;
(e) the result of the multiplication carried out in respect of each subsection in accordance with paragraph 5.2.2.4(d) shall be added together in respect of all surveyed subsections in the [RSL] and this sum shall then be divided by the total length of that [RSL] as set out in the Network Model.