4.9 Installation
(a) General, The Service Provider shall install the Apparatus during the Investment Programmes in accordance with this Output Specification and the relevant PS1 Method Statement. In providing the PS1 Service the Service Provider shall ensure that:
(i) all excavation and reinstatement installation works undertaken in connection with the Service comply with the requirements of this Contract in particular clause 17 (Public Highway Works and Relevant Legislation), this Output Specification the relevant PS1 or PS6 Method Statements;
(ii) Apparatus is not disconnected and left unlit during the hours of darkness prior to a suitable supply being connected and commissioned.
(b) Inspection and Completion
(i) During the Core Investment Programme Period, completion of the Installation of all Apparatus shall be Certified by the Independent Certifier in accordance with clause 13 (Inspection and Completion) of the Contract.
(ii) During the carrying out of Annual Investment Programme works completion of installation of all apparatus shall be self-certified by the Service Provider in accordance with clause 13.4 (Certification by the Service Provider) of the Contract.
(c) Connections
(i) The Service Provider shall effectively manage all Connection(s) works required in delivering the Service. Connections shall be terminated into Apparatus in accordance with the termination arrangement detailed in the relevant PS1 Method Statement.
(i) The Service Provider shall replace all Private Cable Network affected during the installation of new Apparatus as required in delivering the Service subject to the project specific requirements set out in Appendix E (Private Cable Network Requirements) of this Output Specification.