5.14  Performance Targets

(a)  The Service Provider shall meet the following levels of performance in order to avoid any Adjustments to the Unitary Charge under this PS2:

(i)  PS2 Performance Target A: [xxx per cent (xxx%)]7 or more Lighting Points shall be In Light during the Lighting Up Periods;

(ii)  PS2 Performance Target B: one hundred per cent (100%) of Lighting Points (excluding those which are Deemed to Comply and lighting columns which are not In Light) shall provide the Specific Lighting Design Standard during the Lighting Up Periods; and

(iii)  PS2 Performance Target C: Apparatus shall be inspected, tested, cleaned, painted and, where appropriate, replaced in accordance with the minimum frequencies set out in Table 2 below.

Table 2:  Maintenance Frequencies

 

Nature of Characteristic to be inspected
and routinely maintained

Frequency

1

Inspection and testing of mechanical and structural integrity of the Apparatus

8In accordance with the Relevant Standards and the relevant PS2 Method Statement.

2

Inspection and testing of electrical integrity of the Apparatus

 

3

Cleaning of Apparatus

 

4

Change of Lamp in any item of Apparatus

 

5

Painting any item of Apparatus

 

6

Inspection of all Apparatus through the Outage Detection Cycle

 

7

Inspection of all Lighting Points through photometric tests

 




__________________________________________________________________________________________

7 Authority, The Authority should appraise this figure against its own policy and future aspirations for the Service.

8 Authority, The Authority should note that the frequencies associated with this table have been deemed to be a bid back item that should be agreed with the Bidders during dialogue and included within the relevant Method Statements.