5.14 Performance Targets
(a) The Service Provider shall meet the following levels of performance in order to avoid any Adjustments to the Unitary Charge under this PS2:
(i) PS2 Performance Target A: [xxx per cent (xxx%)]7 or more Lighting Points shall be In Light during the Lighting Up Periods;
(ii) PS2 Performance Target B: one hundred per cent (100%) of Lighting Points (excluding those which are Deemed to Comply and lighting columns which are not In Light) shall provide the Specific Lighting Design Standard during the Lighting Up Periods; and
(iii) PS2 Performance Target C: Apparatus shall be inspected, tested, cleaned, painted and, where appropriate, replaced in accordance with the minimum frequencies set out in Table 2 below.
Table 2: Maintenance Frequencies
Nature of Characteristic to be inspected | Frequency | |
1 | Inspection and testing of mechanical and structural integrity of the Apparatus | 8In accordance with the Relevant Standards and the relevant PS2 Method Statement. |
2 | Inspection and testing of electrical integrity of the Apparatus | |
3 | Cleaning of Apparatus | |
4 | ||
5 | Painting any item of Apparatus | |
6 | Inspection of all Apparatus through the Outage Detection Cycle | |
7 | Inspection of all Lighting Points through photometric tests |
__________________________________________________________________________________________
7 Authority, The Authority should appraise this figure against its own policy and future aspirations for the Service.
8 Authority, The Authority should note that the frequencies associated with this table have been deemed to be a bid back item that should be agreed with the Bidders during dialogue and included within the relevant Method Statements.