5.17  Performance Reporting

The Service Provider's performance under this PS2 shall be reported as follows:

(a)  in accordance with the relevant PS2 Method Statement;

(b)  in accordance with the provisions of the Contract and in particular Schedule 17 (Monitoring and Reporting);

(c)  the following PS2 Performance Target A specific monitoring and reporting requirements:

(i)  the number of Lighting Points recorded as not In Light;

(ii)  the number of failures to comply in the relevant Month;

(iii)  the actual length of time taken to complete each Outage Detection Cycle during that Month;

(iv)  the average time taken to restore a Lighting Point to light measured in days and tenths of days during that Month.

(d)  the following PS2 Performance Target B specific monitoring and reporting requirements:

(i)  the number of Lighting Points tested for photometric efficiency;

(ii)  the number of Lighting Points recorded as not providing lights In Light compliant with the Specific Lighting Design Standard;

(iii)  The average time taken to restore the lights In Light to demonstrate compliance with the Specific Lighting Design Standard.

(e)  the following PS2 Performance Target C specific monitoring and reporting requirements:

(i)  the number of Apparatus that have undergone the planned maintenance, test and inspection regime;

(ii)  the number of Apparatus that have not undergone the planned maintenance, test and inspection regime.

All the above information and supporting data shall be included in the Monitoring Report.