Required Outcome
11.1 The Service Provider shall install the Apparatus during the Post Core Investment Programme Period in accordance with this PS8.
11.2 By the end of the Post Core Investment Programme Period, all Apparatus which are Temporary Deemed to Comply shall have been replaced and comply with the Specific Lighting Design Standards in accordance with the Post Core Investment Programme. All replacement Apparatus shall comply with this Output Specification.
11.3 When Temporary Deemed to Comply Apparatus are brought up to the appropriate Relevant Standards, all Apparatus, including Private Cable Networks, within the whole of the street or area in which such Apparatus are contained shall be brought up to the Specific Lighting Design Standards.
11.4 By the end of the Contract Period, all Temporary Deemed to Comply Apparatus shall comply with each Relevant Standard (including, to avoid doubt, the Specific Lighting Design Standards) in this Output Specification.
11.5 In upgrading Apparatus the Service Provider shall comply with paragraph 1.6.
11.6 Lighting design and Installation shall be carried out in compliance with the provisions of PS1 and PS8, and in particular, so as to satisfy PS8 Performance Target A and PS8 Performance Target B. Commissioning shall be carried out in accordance with clauses 13.4 to 13.14 (inclusive) (Certification by the Service Provider) of the Contract.