Sample Appendix (Performance Indicators)
BVPI215(a) - | The average number of days taken to repair a street light fault, which is under the control of the Authority. |
BVPI215(b) - | The average number of days taken to rectify a street light fault, which is under the control of the DNO. |
LP1 - | Percentage of Lighting Points not working as planned. |
LP2 | Percentage of Apparatus more than twenty-five (25) years old. |
LP3 | Percentage of streets which conform to the Specific Lighting Design Standards referred to in this Output Specification. |
LP4 | Average time to repair an Urgent and/or Non-Emergency Fault from first being reported. |
LP5 | Average time to attend an Emergency Fault. |
LP6 | Percentage of inefficient light sources. |
LP7 | Percentage number of repeat visits associated with Non Emergency Faults. |
LP8 | Number of requests for additional lighting. |
LP9 | The number of Faults recorded on the MIS, broken down by origin. |
LP10 | The number of Faults which were not completed within the Maximum Period for Rectification identified in Table 3 of PS3 and this should include the number of days late in each case.] |