Schedules
>
Schedule 14 Insurances
>
Part 1 Policies to be taken out by the Contractor and maintained during the Works Period.
>
1 Contractors' 'All Risks' Insurance (CAR)
>
1.4 Maximum Deductible
1.4
Maximum Deductible
£[
**
].