Schedules
>
Schedule 14 Insurances
>
Part 2 Policies to be taken out by the Contractor and maintained during the Services Period.
>
1 Property Damage Insurance
>
1.4 Maximum Deductible
1.4
Maximum Deductible
£[
**
] each and every claim (escalated periodically as appropriate).