Schedule 14 Insurances
>
Part 1 Policies to be taken out by the Contractor and maintained during the [design and construction phase].
>
1. Contractors' 'All Risks' Insurance (CAR)
>
1.4 Maximum Deductible
1.4
Maximum Deductible
£ [
].