Schedule 14 Insurances
>
Part 1 Policies to be taken out by the Contractor and maintained during the [design and construction phase].
>
2 Delay in Start Up Insurance (DSU)
>
2.5 Maximum Excess
2.5
Maximum Excess
[ ] days.