Schedule 14 Insurances
>
Part 2 Policies to be taken out by the Contractor and maintained during the Service Period
>
1 Property Damage Insurance
>
1.4 Maximum Deductible
1.4
Maximum Deductible
£[ ] each and every claim (escalated periodically as appropriate).