5.4 Waste
The Contractor shall optimise the opportunity for waste minimisation and re-cycling during the Works; including the use of a Site Waste Management Plan.
The Contractor shall ensure that all waste, surplus excavated material and controlled waste (withstanding any excavated material suitable and set aside for landscaping purposes, or that may be suitable for re-use on another site) and all building spoil and rubbish is disposed of to a recognised licensed tip, be transported by an approved waste transportation company, and shall fully comply with all Legislation governing the controlled disposal of waste material. The Contractor shall optimise efficiency and effectiveness in the removal and transport of waste.
No materials shall be disposed of on the Site, or by any other means.