4  Data Collection

4.1  The Service Provider shall be responsible for making all the necessary measurements and collecting the data required for the inputs required in order to calculate the Initial Period Energy Consumption Figure.

4.2  If, in order to obtain the data required to calculate the Initial Period Energy Consumption Figure, supplementary meters and other measuring equipment are required beyond those provided by the Utility Supplier in connection with the Utility Contracts, the Service Provider shall supply, install and maintain at its cost such supplementary meters and measuring equipment.

4.3  Each meter will be connected to the building energy management systems (BEMS), which will provide KWh readings enabling monitoring, recording and data logging.  The BEMS shall be configured to include Trend logs to record/display and calculate flows, totals and archives are to be set up to record the daily total for each energy and utility monitoring meter.

4.4  The meters and measuring instruments used for collecting the data used to calculate the Initial Period Energy Consumption Figure shall be calibrated periodically in accordance with Good Industry Practice to an appropriate measurement standard.  The results of the calibration shall be forwarded to the Authority within [30] Business Days of completion.

4.5  The Service Provider will measure and monitor the volume of energy used and report the results to the Authority.