1.5 Damage of Minor Nature
If any Authority Damage is of such a minor nature (when considered item by item and in aggregate) that it can be remedied by the Contractor without incurring any additional costs through the use of its site-based resources during its normal working hours and without adversely affecting the ability of the Contractor to perform the Services, then the cost of rectifying such damage shall be for the account of the Contractor.