Roofs,  External Walls, Wall Finishes and Chimney

Asset

 

Availability Standard

Failure Event

Full Standard

Rectification Period

Temporary Rectification

Unavailable but Used applicable

Roofs,  External Walls, Wall Finishes and Chimney

5

All components of the construction are to be properly secured, fitted and functional, to provide a wind and weather tight roof, secure, free from water penetration, penetrating damp, energy efficient and fit for purpose.

External envelope and structure is not

•  secure

•  wind and weather tight

•  free from water penetration.

•  fit for purpose.

Y

1

Permissible up to 20 days

Yes

 

6

 

External envelope and structure is not free from damp (as evidenced by the presence of excessive moisture within components and/or visibility of dampness and/or staining within the Zone)

Y

7

Permissible up to 21 days

Yes

 

7

 

Visible evidence of structural damage or defect (including but not limited to brickwork, render finishes, etc.).

Y

14

None

Yes

 

8

 

Failure to keep timber structures, including roof construction and coverings free from rot, rust, decay and damage that materially affects function (including, without limitation, fungal, worm, beetle and other attack).

Y

14

None

Yes