Internal Fixture, Fittings and Finishes
Failure Event | |||||||
Internal Fixture, Fittings and Finishes | 22 | Zone to be maintained free from hazards | All floors and staircases: damage, decay or trip hazard to flooring, floor coverings (where responsibility of Contractor), stairs, banisters and balustrades. | Y | 1 | Permissible up to 20 days | Yes |
13 | Floor coverings to wet areas (kitchens, bathrooms, etc) only: Floor coverings are not classified as "non-slip" by manufacturer or not considered such by the Authority acting reasonably. | Y | 1 | Permissible up to 20 days | Yes | ||
14 | Glazed screens , windows & doors: failure to install safety glazing or safety film to screens, windows and doors where required by legislation | Y | 1 | Permissible up to 20 days | Yes | ||
15 | Internal joinery: damaged or splintered joinery | Y | 1 | Permissible up to 20 days | Yes | ||
16 | All landlord's fixtures and fittings securely and safely installed. | Fixtures & fittings: loose or insecure fixings which may pose a hazard | Y | 1 | Permissible up to 20 days | Yes | |
17 | • Absence of any item of furniture as specified in the Contractors Proposals and as required as per the Zone Data Sheet • Damage to any item of furniture rendering it unsafe to use | Y | 5 | Permissible up to 16 days | Yes | ||
18 | Internal finishes are serviceable and provide a sound base to receive decoration | Internal finishes: rough finish to walls/ceiling, blown/missing plaster, unplastered walls/ceiling, cracked or uneven surfaces, efflorescence or similar | Y | 14 | None | Yes | |
19 | Decorations to Zones other than apartments do not fail the standards set in Annex [ ]. | Y | 14 | None | Yes | ||
20 | All internal partitions are to be maintained in a sound and structurally stable condition. | Internal partitions are not safe, structurally stable or sound. | Y | 14 | None | Yes |