3.2.1 New Build Housing
The new housing developments will offer a range of accommodation, including [ ]5.
In addition and where site and planning authority constraints allow, the Contractor may design and construct further units on the same site[s] for capable of offering a range of affordable home ownership options including shared ownership, staircasing options or outright sale. The Contractor should make all efforts to integrate tenures to ensure that these additional units are indistinguishable from those within the PFI, but for the avoidance of doubt, the standards set out in this Output Specification are intended to apply to the PFI Dwellings only.6
____________________________________________________________________________________________
5 The types of accommodation should be detailed here – for example 1 and 2 bedroom flats, 2/3/4f bedroom houses/bungalows, etc,
6 This paragraph is should be deleted if the project is solely delivering social rented housing covered by the project arrangements.