Part 1 Breakdown of Fee
The Surveyor] undertakes to carry out the Stock Condition Survey for the following fee:
Pounds (£) | ||
Stock condition survey | ||
[CCTV drainage survey | ] | |
[Geotechnical survey | ] | |
[Land Contamination survey and report | ] | |
CAD drawings | ||
[Other] | ||
|