TABLE 16-2, CONTRACTOR PERFORMANCE EVALAUTION REPORT
TABLE 16-2, CONTRACTOR PERFORMANCE EVALAUTION REPORT | |||||||
Ratings Excellent | Period of ________________________________ | ||||||
Very Good | _______________________________________ | ||||||
Marginal | _______________________________________ | ||||||
Submarginal | PNS Technical Monitor/s____________________ | ||||||
CATEGORY | CRITERIA | RATING | ITEM FACTOR | EVALUATION RATING | CATEGORY FACTOR | EFFICIENCY RATING | |
A | TIME OF DELIVERY A-1 Adherence to Plan Schedule | ________ x | .40 | = ________ | |||
A-2 Action on Anticipated Delays | ________ x | .30 | = ________ | ||||
A-3 Plan Maintenance | ________ x | .30 | = ________ | ||||
Total Item Weighed Rating | ________ x | .30 | = ________ | ||||
B | QUALITY OF WORK B-1 Work Appearance | ________ x | .15 | = ________ | |||
B-2 Thoroughness and Accuracy of Work | ________ x | .30 | = ________ | ||||
B-3 Engineering Competence | ________ x | .20 | = ________ | ||||
B-4 Liaison Effectiveness | ________ x | .15 | = ________ | ||||
B-5 Independence and Initiative | ________ x | .15 | = ________ | ||||
Total Item Weighed Rating | ________ x | .40 | = ________ | ||||
C | EFFECTIVENESS IN CONTROLLING AND/OR REDUCING COSTS C-1 Utilization of Personnel | ________ x | .30 | = ________ | |||
C-2 Control of all Direct Charges Other than Labor | ________ x | .30 | = ________ | ||||
C-3 Performance to Cost Estimate | ________ x | .40 | = ________ | ||||
Total Item Weighed Rating | ________ x | .30 | = ________ | ||||
TOTAL WEIGHT RATING __________________________________________ Rated by: ______________________________________________________ Signature(s) ____________________________________________________ | |||||||
NOTE: Provide supporting data and/or justification for below average or outstanding item ratings. | |||||||