Construction and Architect-Engineer Services Performance Evaluation (DFARS Case 2010-D024)

Summary:

DCN 20110920 includes a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to remove the requirement to use DoD-unique forms to prepare contractor performance evaluations for construction and architect-engineer services.

Supplementary Information:

Background

This rule removes the requirement to use DoD-unique forms to document contractor past performance for construction and Architect-Engineer services. On April 19, 2011, DoD published a proposed rule in the Federal Register at 75 FR 21851 to delete outdated procedures and references to obsolete DD forms. No public comments were received in response to the proposed rule.

One editorial change is being made to the final rule. The references to "A-E" are revised to read "architect-engineer" in sections 236.102, 236.602-70, 236.606-70, and in 236.609-70.

Dates:

The Effective Date for this final rule is 20 September 2011.

Click here to read the entire Federal Register notice for this rule.