2.2.4 Cross-Referencing
To the greatest extent possible, each volume shall be written on a stand-alone basis so that its contents may be evaluated with a minimum of cross referencing to other volumes of the proposal. Information required for proposal evaluation which is not found in its designated volume will be assumed to have been omitted from the proposal.
Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity.
Cross-referencing within a proposal volume is not permitted.
The offeror shall fill out the cross reference matrix at Attachment _______of this ITO indicating the proposal reference information as it relates to the ITO, SOW/SOO/PWS, CLIN numbers, and CDRL references found therein.
The offeror shall provide a cross-reference matrix indicating by ITO, SOW/SOO/PWS, and/or specification paragraph number, the corresponding proposal paragraph in that section which addresses the referenced item.