4.2.1.2  Inconsistency Between Evaluation Factors and Requirements Documents

The requirements documents failed to task the contractor to perform the work described in Section M by a Mission Capability subfactor.  This leads to confusion on the part of the offerors, an inability to satisfy the missing requirement, and an inability to propose adequately for that subfactor.