RATING TEAM WORKSHEET

This template is provided as Informational Guidance.  It is a "Best Practice" example.

OFFEROR:

INITIAL EVALUATION

FINAL EVALUATION

MISSION CAPABILITY

TECHNICAL RATING:

[

BLUE (Exceptional)

GREEN (Acceptable)

YELLOW (Marginal)

RED (Unacceptable)

NARRATIVE:  [Include strengths, uncertainties, and deficiencies (material failure to meet Government requirement).  Explain how proposal exceeds or fails to meet requirement.  If it exceeds the requirement, explain how it benefits the Air Force.]

RISK RATING:  Indicate risk rating of low, moderate, high, or unacceptable for each subfactor, if used, and include weaknesses and deficiencies.  Explain how each increase of risk contributes to the rating considering the potential for disruption of schedule, increased cost, or degradation of performance:

 

LOW

MODERATE

HIGH

UNACCEPTABLE

Optional :

LOW "+"

MODERATE "+"

HIGH "+"

 

NARRATIVE:

COST/PRICE RISK (IF USED)

RISK ASSESSMENT:  (Indicate risk rating of low, moderate, high)

LOW

MODERATE

HIGH

NARRATIVE:

PAST PERFORMANCE

ASSESSMENT:

SUBSTANTIAL CONFIDENCE
SATISFACTORY CONFIDENCE

LIMITED CONFIDENCE
NO CONFIDENCE
UNKNOWN CONFIDENCE

NARRATIVE:

PRICE / COST

TOTAL PRICE / COST:  $ _______________

NARRATIVE:

EXCHANGES WITH OFFERORS


______________________________________
SIGNATURE (Contracting Officer)

 


______________________________________
SIGNATURE (Lead Technical Evaluator)