RATING TEAM WORKSHEET
This template is provided as Informational Guidance. It is a "Best Practice" example.
OFFEROR: | INITIAL EVALUATION | FINAL EVALUATION |
MISSION CAPABILITY TECHNICAL RATING: | ||
[
BLUE (Exceptional) | GREEN (Acceptable) | YELLOW (Marginal) | RED (Unacceptable) |
NARRATIVE: [Include strengths, uncertainties, and deficiencies (material failure to meet Government requirement). Explain how proposal exceeds or fails to meet requirement. If it exceeds the requirement, explain how it benefits the Air Force.] RISK RATING: Indicate risk rating of low, moderate, high, or unacceptable for each subfactor, if used, and include weaknesses and deficiencies. Explain how each increase of risk contributes to the rating considering the potential for disruption of schedule, increased cost, or degradation of performance: |
LOW | MODERATE | HIGH | UNACCEPTABLE |
Optional : | LOW "+" | MODERATE "+" | HIGH "+" |
NARRATIVE: | |||||
COST/PRICE RISK (IF USED) RISK ASSESSMENT: (Indicate risk rating of low, moderate, high) | |||||
LOW | MODERATE | HIGH | |||
NARRATIVE: | |||||
PAST PERFORMANCE ASSESSMENT: | |||||
SUBSTANTIAL CONFIDENCE | LIMITED CONFIDENCE | ||||
NARRATIVE: | |||||
PRICE / COST TOTAL PRICE / COST: $ _______________ NARRATIVE: | |||||
EXCHANGES WITH OFFERORS | |||||
|
| ||||