Architect-Engineer (A-E)
# | Subject | Topic | Action | Reference |
Architect-Engineer (A-E) | ||||
180 | Liability | Did you consider putting a limitation on a dollar threshold for this A-E contract? | FAR 36.609-1(A) | |
181 | Are there instances where redesign may become an issue? | |||
182 | Congressional Notification | Is a written determination required? | ||
183 | Is congressional notification required? | DFARS 236.601 | ||
184 | Statute | Did you address statutory considerations? | DFARS 236.606-70 | |
185 | Design | How are design errors, deficiencies, or inadequacies remedied? | FAR 36.608 / FAR 36.609-2 | |
186 | Are justifications necessary if there is no remedy proposed? | |||
187 | Are changes to the contract the result of A-E design errors, deficiencies, or inadequacies? | |||
188 | Did you establish a suspense system to ensure timely submittals? | |||
189 | How will you remedy this situation? | |||
190 | Will you conduct design reviews in accordance with the Statement of Work? | |||
191 | How will you ensure the proper classification of employees? | |||
192 | How will you manage overtime? Tracked? Verified? | |||