| | MACC Third Option Period (1 Oct 04 - 30 Sep 05) FFP - 0004AA MACC is a multiple award, competitive design-build indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on a general statement of work further defined with each individual task order. Work to be performed under the MACC will be the general construction category, to include maintenance, repair, alteration, mechanical, electrical, heating/air conditioning, demolition, painting, paving, and earthwork in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.) 0004AB Minimum/Maximum Contract Amounts The guaranteed minimum amount over the life of this project is $5,000.00 per contract awarded. The total aggregate maximum amount of this project, with all options exercised, shall not exceed $50 million. 0004AC Project Design Occasionally, the government will have a need to establish a final price for a project which is not already funded but for which there is a reasonable expectation that funding will be received in the future. In that case, an RFP will be issued to a contractor for preparation of a 35% design (if not already designed) and a cost proposal. The 35% design fee (not to exceed the 6% statutory limit) shall be negotiated for those projects not already designed. The contractor must provide an acceptance period of 120 calendars days following establishment of a final price. If the project is awarded prior to 120 calendar day acceptance period, the contractor will be issued a delivery order to complete design work as needed and accomplish the construction. If the project is not awarded within the 120 day acceptance period following the establishment of a final price, the contractor will be paid the negotiated 35% design fee. |