(xi)  Step Eleven: Sum up the Results of Steps Four through Ten.

Look at Figure 6.A, in which you have entered the estimates resulting from Steps Four through Ten. Add the five building block estimates and enter the sum as the first subtotal. Subtract the first offset and then the second to arrive at your "TOTAL" cancellation ceiling estimate.