Architect-Engineer (A-E)

#

Subject

Topic

Action

Reference

Architect-Engineer (A-E)

180

Liability

 

Did you consider putting a limitation on a dollar threshold for this A-E contract?  

FAR 36.609-1(A)

181

 

 

Are there instances where redesign may become an issue?

 

182

Congressional Notification

 

Is a written determination required?

 

183

 

 

Is congressional notification required?

DFARS 236.601

184

Statute

 

Did you address statutory considerations?

DFARS 236.606-70

185

Design

 

How are design errors, deficiencies, or inadequacies remedied?  

FAR 36.608 / FAR 36.609-2

186

 

 

Are justifications necessary if there is no remedy proposed?  

 

187

 

 

Are changes to the contract the result of A-E design errors, deficiencies, or inadequacies?  

 

188

 

 

Did you establish a suspense system to ensure timely submittals?  

 

189

 

 

How will you remedy this situation?  

 

190

 

 

Will you conduct design reviews in accordance with the Statement of Work?  

 

191

 

 

How will you ensure the proper classification of employees?

 

192

 

 

How will you manage overtime?  Tracked?  Verified?