MEMORANDUM FOR THE SECRETARY OF THE NAVY
Subject: Analysis of Market Research and Analysis of Alternatives for ________________
1. Purpose
The purpose of this analysis is to evaluate whether ___________ of satisfactory quality and sufficient quantity, and in the required form, can be procured as and when needed for Contract ______________ in support of the ________ program or if any other alternatives are acceptable. [If the Government performed the market research itself, only the analysis of alternatives is necessary for this memo. Additionally, the information contained herein may be contained in separate memos, if desired.]
2. Methodology Used in Market Research
[Explain how the restricted items to be acquired or any item of individual equipment containing the restricted item(s) were identified and what the individual equipment items are. Specify the restricted items involved to the degree possible.
If this request covers a group of equipment items and a representative sample was selected, explain the total number of items involved and the procedures for selecting the sample. An example would be that a list of all equipment was assembled and a random number generator was used to select a specific percentage of the items. Note whether the items were identified by the contractor or the Government.
Identify whether information about the restricted items/material was provided by a prime contractor or subcontractor for the end item or component involved.]
3. Issues
[Summarize issues investigated relative to contractor's assertion of non-availability. Examples are: predominant industry location, status of industry in qualifying countries, alternative materials/parts, US Government market share, cost of changes, Original Equipment Manufacturer, Qualified Parts List, or any other qualification required.]
4. Findings of Market Research
a. Materials/Suppliers - [Discuss manufacturers contacted, location of manufacturer and sources of supply, whether the manufacturer can track the material or items to source, degree of compliance/non-compliance asserted, willingness to analyze items for compliance if not already known, any conclusions as to veracity of compliance statements. If the manufacturer states its parts are compliant but the sources of supply (vendors) contradict or undermine this statement, this should be noted. If a manufacturer or supplier's interpretation of the material or item requirements is incorrect, this should be noted.
Examples of this would be an assumption that reprocessing or dying of fibers, yarns, fabrics, or materials qualified or that the small purchase exception is applicable at lower tiers of subcontracting. If more than one type of restricted material or item is involved in the DNAD, each should be treated in a separate section.]
b. State of Industry - [Discuss research done on the industry overall. This would include studies done by other organizations, annual industry sales and the US Government market share, information obtained from sources such as the Defense Logistics Agency, Department of Commerce or National Association of Manufacturers, internet surveys conducted, information obtained from other DNADs, commercial aspects of the industry. Discuss what portion of manufacturers and/or suppliers are represented in this document and efforts to identify additional sources through means such as notices in the Commerce Business Daily or Urgent Data Requests through the Government Industry Data Exchange Program.]
c. Other Issues - [Discuss any other issues relevant to this DNAD such as logistics considerations or whether an item is a critical capability for DoD].
5. Alternatives Considered and Effects of Compliance
a. Material/part alternatives considered and effects of compliance - [Explain the economic and schedule consequences if compliance were mandated for the specific material/part. This would include costs and time to build facilities, costs of insuring compliant materials were segregated in the supply system, redesign costs, or costs of any other alternatives considered.]
b. Alternative Acquisition Strategies Considered - [Explain any alternatives considered to buying the noncompliant material/part. These alternatives may include considering different end items to fulfill the requirement or using a different component/part in the end item. Effects of alternatives in terms of reengineering, delayed deliveries, mission impacts, etcetera, should be explained. Address the price reasonableness of buying compliant alternatives; can the price of the alternative be determined to be fair and reasonable?].
6. Recommendation/Signatures
[Briefly, summarize conclusions and give a recommendation. If analysis was performed by a support contractor or an organization other than the requiring activity, signatures should be identified to that organization/contractor and certification of why alternatives are not acceptable should be provided as an additional section or separate document].
[If this analysis was performed by the requiring activity, the certification as to why alternatives are not acceptable should be included in this section along with the requiring activity signatures.]