9.6  RELAXATION OF HANDBACK REQUIREMENTS

9.6.1 Section 10 (Surveys on Expiry and Termination) deals with surveys on expiry and under Clause 10.5 (Surveys on Termination) the Authority may agree with the Contractor to a relaxation in Handback Requirements since the savings thereby generated are to be shared with the Authority.