E.2 Insurance Policies and Terms

[List all required insurances during the construction period which may include:

■  Delay in start-up

■  Construction/erection all risks

■  Third party liability

■  Workmen's compensation/employer's liability

■  Motor vehicle and other personal property.]

For each type of insurance, specify the following:

Minimum Cover:

[•]

Minimum Sum Insured:

[•]

Minimum Sub-limits:

[•]

Maximum Deductible:

[•]

Period of Cover:

[•]

Insured Parties:

[•]

Required Coverage:

[•]

Required Extensions:

[•]

Permitted Exclusions:

[•]