1. Does the project comply with proposed standards for facilities and services?
2. Does the costing utilize the latest prices of materials required for the project?
3. Is the project able to address the actual demand and need of the locality?
4. Are the technical descriptions of the project properly defined and explained?
5. Is there a plan for construction, installation and operation of the facility?
6. Is there a location map?
7. Is there a proposed building layout?
8. Are the technology, production processes, size and coverage, location and timing of implementation properly selected from among various and equally acceptable alternatives? Do they adhere to effectiveness and cost- efficiency?