OPERATING STANDARDS

The potable water scheme will be operated over an 18 hour period per day with water pressured maintained over a 24 hour period each day. Meter reading and billing will be on a monthly basis. Maximum response time to system failures will be 10 minutes for mains or connections.

The minimum treatment water quality standard will be ____.

Fire Hydrants

The spacing standard for fire hydrants will be ___ meters. The flow capacity of hydrants will be square meters per second.

Deep Well Specifications

Project specifications will be site-specific.

Deep Well Pumps and Controls Specifications

Project specifications will be site-specific.

Water Meter Specifications

Project specifications will be site-specific.

Electrical Connections

Project specifications will be site-specific.

Pump House Specifications

Project specifications will be site-specific.

Chlorination Equipment Specifications

Project specifications will be site-specific.

Security Fence Specifications

Project specifications will be site-specific.

Site Works Specification

Project specifications will be site-specific.

Administrative Building Specifications

The Administrative Building will be 400 square meters in size. Project specifications will be site-specific.

Quality Control Laboratory Specifications

The Laboratory will be 50 square meters in size. Project specifications will be site-specific.

Maintenance Workshop Specifications

The maintenance workshop will be 100 square meters in size. Project specifications will be site- specific.

Elevated Water Tank Specifications 

Project specifications will be site-specific.

Water Main Specifications

Water mains will be 150 mm/100 mm PUC at 50,000 meters.

Water Connection Specifications

Water pipe will be ____ mm estimated at ____ meters.

Fire Hydrants

Project specifications will be site-specific.