Overview

The Facilities shall be designed and constructed to (1) take MSW to be delivered by the LGU using different types of collection vehicles at the Materials Recovery Facility, (2) sort and recover recyclable or reusable materials from the waste stream, (3) transport the residual waste to the Sanitary Landfill, and (4) accept and process or otherwise dispose of MSW according to the volume, rates of acceptance, and delivery schedule agreed between the LGU and the Company within the limits set out in Table [] of Schedule [] (Delivery Schedule and Operating Procedures).