E.2.1  Insurance Coverage during the Construction Period

[List all required insurances during the construction period which may include:

  Marine cargo/transit

  Delay in start-up

  Construction/erection all risks

  Third party liability

  Workmen's compensation/employer's liability

  Motor vehicle and other personal property.]

For each type of insurance, specify the following:

Minimum Cover:

[]

Minimum Sum Insured:

[]

Minimum Sub-limits:

[]

Maximum Deductible:

[]

Period of Cover:

[]

Insured Parties:

[]

Required Coverage:

[]

Required Extensions:

[]

Permitted Exclusions:

[]